Six steps of the whole process analysis and specif

2022-07-22
  • Detail

The cabinet installation can be carried out only after the kitchen floor tiles and wall tiles are paved and the sewage renovation is completed. If there is a hollow wall on the wall of the kitchen, the cabinet manufacturer should be informed in time, because the hollow wall cannot be installed with a hanging cabinet, and the construction team needs to prepare relevant installation tools in advance. If the installation workers do not understand the situation of the consumer's home comprehensively at the beginning, the cabinets may not be installed after arriving at the site, delaying the installation time

step 1: before installing the floor cabinet, workers should clean the kitchen floor to accurately measure the ground level. If the cabinet and the ground cannot reach the level, the gap of the cabinet door cannot be balanced. The installer will use a level ruler to measure the ground and the wall to understand the ground level, and finally adjust the cabinet level. If the base cabinet is L-shaped or U-shaped, you need to find the reference point first. The L-shaped floor cabinet extends from the right angle to both sides; The U-shaped floor cabinet is first stacked neatly in the middle, and then stacked from two right angles to both sides to avoid cracks. After the ground cabinet is stacked, it is necessary to level the ground cabinet and adjust the levelness of the ground cabinet through the adjusting leg of the ground cabinet. The connection between the ground cabinets is also an important step. Generally, four connectors are required between the cabinets to ensure the tightness between the cabinets. In order to save costs, some non brand manufacturers use self tapping screws with poor quality, which not only affects the beauty of the cabinet, but also can only lock the cabinet from one end, and the connection degree is not high

step 2: install the hanging cabinet after the installation of the ground cabinet. When installing the hanging cabinet, in order to ensure the level of the expansion bolt, it is necessary to draw a horizontal line on the wall. Generally, the distance between the horizontal line and the table top is 650 mm. Consumers can propose to the installer the adjustment of the distance between the floor cabinet and the hanging cabinet according to their own height, so as to facilitate future use. When installing the hanging cabinet, it is also necessary to connect the cabinet with connectors to ensure the tightness of the connection. After the installation of the cupboard, the level of the cupboard must be adjusted. The level of the cupboard will directly affect the beauty of the cupboard

step 3: countertop installation at present, most cabinet countertops used by consumers are artificial stone or natural stone countertops. The stone table top is bonded by several stones. The bonding time, glue amount and grinding degree will affect the beauty of the table top. Generally, it takes half an hour to bond the table in summer and 1-1.5 hours in winter. Professional glue shall be used for bonding, and grinding machine shall be used for polishing. In addition, some cabinet manufacturers will install the countertops within a period of time after the installation of the floor cabinet and the hanging cabinet in order to bring errors due to decoration, and there will be a process of measuring the countertops in the middle

step 4: hardware installation, water basin, faucet and basket are also the highlights of the cabinet. When installing the hanging cabinet and table top, in order to prevent wood chips from falling into the basket track, cover the basket with a cover to avoid affecting future use. The installation of water basin involves the problem of drainage. When installing cabinets, the way of on-site opening will be adopted for water installation. Professional puncher will be used to punch holes according to the size of the pipe. The diameter of the hole should be at least 3 to 4 mm larger than the pipe. After drilling, the opening part should be sealed with sealing strip to prevent water seepage and swelling deformation at the edge of the wood, which will affect the service life of the cabinet. In order to prevent water seepage in the water basin or sewer, the connection between the hose and the water basin should be sealed with sealing strip or glass glue, and the hose and sewer should also be sealed with glass glue

step 5: installation of appliances in the kitchen appliance installation. The installation of embedded appliances in the cabinet only needs to open the power hole on site. However, the power hole cannot be opened too small to avoid inconvenient disassembly during future maintenance. When installing the range hood, in order to ensure the use and smoking effect, the distance between the range hood and the stove is generally between 750 and 800 mm. When installing the range hood, it should be aligned with the stove left and right, and the height can be adjusted according to the actual situation. The most important thing in installing the stove is to connect the gas source. It is necessary to ensure that the gas connection port does not leak. The gas source should generally be connected by the natural gas company. If it is installed by decorators, it is also necessary to have the natural gas company come to the door to detect whether there is a leak

step 6: adjust the cabinet door. Adjust the door panel to ensure that the gap of the cabinet door is uniform, horizontal and vertical. The depth of the ground cabinet is generally 550 mm, and the depth of the hanging cabinet is 300 mm. Remind consumers that they can also adjust according to the actual situation. After adjusting the cabinet door, workers should also clean up the garbage left when installing the cabinet to ensure the cleanliness of the owner's kitchen